Al Anbar Palestine Bridge


Project Name : Reconstruction of the Palastine Bridge
Country/ City    : Al Anbar Region-Iraq
Employer  : UNDP
Partner : Al Courum /Iraq
Descriptions  :

The UN development Programme (UNDP) is working closely with authorities to support displaced people who are returning to liberated areas to rebuild their lives after the liberation from ISIL forces. 

The total length of the recent bridge is about 530m and it consists of two parallel separate bridges of 18.75m cross section for each and 6.5m distance in between of them. The northern part operated for transport from Baghdad to Rutba (Iraqi-Jordanian Borders) and the southern part operated in opposite direction from Rutba to Baghdad. 

The scope of the required works can be summarized but without being limited to the following: 


  • ➢ Surveying works;

  • ➢ Structural works;

  • ➢ Asphaltic works;

  • ➢ Storm water works. 

The works including supply, install all the required materials and equipment, testing & commissioning and training of all related equipment and as detailed in the Price Schedule/Bills of Quantities and Technical Specifications and all other ancillary work required to complete the entire scope of works completely and in accordance with the instructions of the supervision engineer.

The Works includes provision of required manpower, machinery and materials for the works as described hereunder and under the Technical Specifications, Price Schedule/Bills of Quantities and Drawings.

 
Contract Value : 9.833.476 usd 
Completion Tıme         : 14 months
Start Of Project : 2018
Completion Of Project   : 2019